Punch List Template

A numbered punch list per area with responsible, due, done and verified columns — plus the twelve categories these lists always miss.

Build the list

Areas to walk
Lines per area
8
55 lines

Walk it twice, at two heights

Once standing, once crouched.

An enormous proportion of what ends up on a punch list is at floor level — trim scribing, transitions, gaps at the base of doors, caulk lines at the bottom of tiling, paint on skirting — and none of it is visible from standing height. The second pass takes ten minutes and roughly doubles what you find.

Do it in daylight, with the lights also on. Raking light from a window finds paint and drywall defects that overhead light hides completely.

Number every line

Not for tidiness. Numbering is what makes the rest of the process work, because every conversation afterwards becomes “items 4, 9 and 17” rather than a fresh description of the same three problems.

Write items so that someone who was not standing next to you can find them:

Weak     Touch up paint in kitchen
Strong   #12 — scuff on wall left of kitchen window, eye level, approx 2 inches

The weak version is an argument. The strong version is an instruction.

Done and verified are different columns

This is the distinction that keeps a punch list from drifting for six weeks.

Done is the contractor’s claim. Verified is you having looked at it. A job closes when every numbered item has a tick in the second column, not the first, and the sign-off block is signed against the verified column.

Set a single re-walk date rather than checking items off one at a time. One appointment, whole list, closed.

Timing decides everything

Walk it when the work is substantially complete and the site is clean enough to see, and before the final payment.

The mechanism is simple and it is not adversarial: once a crew has moved to the next job, coming back for six small items competes with work that is currently paying them, and it will lose that competition every time. Money still owed is the only scheduling tool you have, and both parties know it. A punch list walked before the final payment usually closes in a week; one walked after it can take months.

The twelve categories these lists always miss

Included on the printed sheet, because they are missed with real consistency:

  • Caulk and grout at every change of material
  • Paint holidays, roller marks and cut lines — look in raking light
  • Doors that rub, do not latch, or have uneven gaps
  • Cabinet doors and drawers out of alignment, soft-close not working
  • Trim mitres and unfilled nail holes
  • Floor transitions, squeaks, gaps at the perimeter
  • Every outlet, switch and cover plate — tested and straight
  • Every tap, drain and toilet, run, with a look underneath
  • Extractor fans that make noise but do not move air, and vents that terminate in the attic
  • Windows that will not lock, and missing screens
  • Site clean-up: debris, HVAC filters replaced after all that dust, protection lifted
  • Handover documents — manuals, warranties, and the exact paint colours and product names

That last one is the most valuable and the most forgotten. In two years you will want to touch up a wall, and “some sort of off-white” is not a colour you can buy.

The verified column is the whole document. Everything else on the sheet is administration around the moment somebody goes back and looks.

Frequently asked questions

What is a punch list?

The list of everything outstanding at the end of a job — the small defects and unfinished items that stand between substantially complete and actually finished. It is written by the owner, walked with the contractor, and it is what final payment is held against.

When should I walk the punch list?

When the work is substantially complete and the site is clean enough to see, but before the final payment and before the crew has moved to their next job. Once the crew has gone, returning for six small items competes with a job that is paying them, and it will be slow.

Why does the sheet have both a done and a verified column?

Because "done" is the contractor’s claim and "verified" is your inspection of it, and conflating them is how punch lists drift. A re-walk of the numbered items is what closes a job. The sign-off is against the verified column, not the done one.

What do punch lists usually miss?

The same categories every time: caulk lines at material changes, paint holidays and cut lines, doors that rub or do not latch, cabinet alignment, trim mitres and unfilled nail holes, outlet plates, whether extractor fans actually vent outside, and the handover documents — manuals, warranties and the paint colours you will need in two years.

How specific should each item be?

Specific enough that someone who was not there can find it. "Touch up paint" is an argument; "scuff on the wall left of the kitchen window, about eye level" is an instruction. Number every line and refer to the numbers in every conversation afterwards.