Kitchen Remodel Checklist

The decisions to make before anything is ordered, a budget sheet, and the order the work has to happen in.

How big is the job?

Scope
56 lines

The decisions that are free now and expensive later

Almost every kitchen regret is about how the room works rather than how it looks, and almost all of it is fixed at the layout stage — while it is still a drawing and costs nothing to change.

The questions worth answering before anything is ordered:

  • Where does the bin go? The most-used object in a kitchen, decided last in most projects, and then wrong every day for a decade.
  • What is beside the hob, for pans and utensils, and what is beside the sink, for washing up?
  • Where do you put the shopping down when you come in?
  • Which way does the dishwasher door open, and does it block the route through the room?
  • Which side does the fridge open, and does that work where it is going?
  • Are there enough sockets — and then add more than the plan shows.
  • Where does the extractor actually vent to, and is that route physically possible?

None of these appear on a mood board. All of them are what the room feels like to use.

The one decision that moves the price most

Whether the sink and the hob stay where they are.

Keeping them means the plumbing, the drainage, the gas and the extraction all stay put, and the job becomes a replacement. Moving either means new supply and waste runs, often new electrical, sometimes a new vent route through a wall or ceiling — and the trade time multiplies rather than adding.

Sometimes it is worth it. A layout that genuinely does not work is worth fixing. But it should be a deliberate decision with a number attached, not something that happens because a designer drew it that way.

Why the middle of the job stalls

Every kitchen has a gap in it and it always surprises people:

Cabinets installed and levelled
      ↓
Worktop templated  ← cannot happen until the cabinets are in
      ↓
1–2 weeks fabrication
      ↓
Worktops fitted

Stone worktops are templated on the cabinets as they actually sit, not from the drawing, because a millimetre of variance in an installed run matters. So there is a fortnight in the middle of the job with cabinets, no surfaces, no sink and a fridge in the hall.

It cannot be removed, only planned for.

Order of work

Two points people get wrong regardless of scope:

Paint the ceiling and first coats before the flooring. Painting around a finished floor means masking the whole thing and working slowly to protect it — more effort, worse result.

Final coat of paint after the trim, once everything that could scuff a wall has been carried through the room.

Budget

Cabinets and labour are the two largest lines in almost every kitchen, by a wide margin. Appliances feel expensive and are usually a smaller share than people expect.

Then contingency: fifteen to twenty percent, and more in an older house. Kitchens hide plumbing, wiring and old water damage behind cabinets that have not moved in thirty years, and the strip-out reveals all of it in one afternoon. That is the moment to stop, reprice and decide — not to absorb it silently and discover at the end that the job ran forty percent over.

Drawers, not doors

The single change people report being most glad of.

A base cabinet with a shelf means kneeling down and reaching into the dark for whatever is at the back. A deep drawer brings the whole contents out to you. It costs modestly more per unit and it changes how the kitchen is used every day.

Living without a kitchen

Plan it properly, because two weeks becomes five and the temporary arrangement is what you actually live in.

Kettle, microwave and fridge somewhere else. A water source you can reach and a plan for washing up. The kitchen packed properly rather than piled in the hall. And seal the doorway with plastic and cover the HVAC returns — kitchen demolition dust otherwise travels through the whole house and settles in the coil, which is a bill nobody budgets for.

Then budget for eating out, because you will.

Write the paint colours and product names down and keep them with the house records. In two years you will want to touch up a wall, and “a sort of warm white” is not something you can buy.

Frequently asked questions

What decides the cost of a kitchen remodel?

Cabinets and labour dominate almost every budget. After those, the biggest single lever is whether the sink and the hob stay where they are — moving either means plumbing, electrical and often venting work that multiplies the trade time. Keeping the layout and replacing everything in place is dramatically cheaper than re-planning the room.

Why do worktops hold everything up?

Stone worktops are templated on the cabinets as installed rather than from a drawing, so the template cannot happen until the cabinets are in and level — then fabrication takes one to two weeks. That gap sits in the middle of the job, with a kitchen that has cabinets and no surfaces, and it surprises people on essentially every project.

How long does a kitchen remodel take?

A cosmetic refresh is a week or two. Replacing cabinets and worktops in the existing layout is typically four to six weeks including the worktop gap. A full gut with a layout change and permits runs eight to twelve, and longer if anything unexpected turns up at strip-out. Plan for the long end and be pleasantly surprised.

What is the decision people most regret?

Where the bin goes. It sounds trivial and it is the most-used thing in a kitchen — decided last, squeezed in wherever there is room, and then irritating every single day. The same applies to whether there is somewhere to put shopping down, and whether the dishwasher door blocks a walkway when open.

Drawers or cabinet doors?

Deep drawers for pans and food, in almost every case. A base cabinet with a shelf means kneeling and reaching into the dark for the thing at the back; a deep drawer brings everything to you. It costs modestly more and it is the change people report being most glad of.

How much contingency should a kitchen have?

Fifteen to twenty percent, and more in an older house. Kitchens hide plumbing, wiring and water damage behind cabinets that have not moved in thirty years, and the strip-out is when all of it appears at once. That is the point to stop, reprice and decide — not to absorb it quietly.